Middle of Week #3

Hello everyone,

the last two days have been really tiring, because we started testing the first distribution and remote installation system for the Staff-PCs. Up until now every PC was installed manually but with the rising count of workstations and Laptops my colleagues decided to implement the distribution of Windows over the network.
And my job in the last two days was to assist Graham with the testing of the system. For this purpose we occupied the training room at Cultra Manor and set up 15 new Office clients and 12 new Laptops.

Cultra Manor

 

In the end we had only a half remote installation, which meant we had to install most of the software and drivers manual and cost us a lot of time (10 hours on both days) but we got the Job done and the clients are ready to be handed over to their new users. But we will try to optimize the procedure and reduce the manual configuration of the clients to a minimum.

only took the picture because I played around with my camera :D
The new laptop clients

 

In addition to the work at the clients I installed the VPN-router yesterday and it works like a charm, we had to do a little research to find out that the ISP is using VLAN insertion for the dial up connection.
Tomorrow I will drive to Armagh with Robin to install the counterpart for the router in Cultra and set up the VPN connection and probably help Robin with a few other issues that he has to take care of. I hope to take a few nice pictures of Armagh as I will not have the chance to go there that often, mainly because it takes about 90 minutes by car to reach it.

Read you on Sunday, and to show you how beautiful my workplace is, here is a picture taken from maybe one of the highest points at the Folk Museum.

A view upon Cutra Manor and beyond

 

Yours sincerly,

Tobias

2 Gedanken zu „Middle of Week #3“

Schreibe einen Kommentar